Excavation and Slope stabilization for diversion channel and spillways of two dams in North Ontario using soil nailing technique with a mix of solutions with soil anchors, welded wire mesh and shotcrete.
Remote and isolated site project with a fast pace work with consecutive 7 days working weeks and sometimes in a 7/24 schedule and negative temperature conditions.
Engage the biggest number of AirTrack’s for soil nail installation filled with resin due to extreme low temperature conditions.