KITCHENER WWTP

Location:

Kitchener ON

Solution:

Design Build Soil Anchors

Client:

GRAHAM / HARBRIDGE & CROSS JV

Job Income:

$2,700,000 CAD

About The Project

Structures Upgrade of Kitchener Wastewater Treatment Plant. Design Build Soil Anchors design to avoid the uplift effect due to high water table level.

The Challenge

Installing 2,000 soil anchors drilling in underwater sandy / gravel soils.

The Solution

Mobilizing three machines using double casing drilling system and pressure grouting trough the temporary casing for soil anchors injection.